Ongoing Project
1. Rehabilitation of Al-Maghazi Dumpsite – Al Nusairat
Scope of Work:
The project includes reshaping and regulating the existing landfill, clearing debris, redistributing waste, creating engineered layers of silty clay, implementing stormwater channels, constructing ramps, and installing perimeter fencing and access roads. Works also include continuous handling of daily incoming waste, ensuring environmental safety, and executing all tasks in accordance with approved drawings and engineer instructions.
Value: USD 94,815
Status: Ongoing
2. Light Rehabilitation and Deep Cleaning for 7 PA Schools – Gaza Strip
Scope of Work:
The project covers structural repairs, block works, plastering, painting, tiling, carpentry, aluminum and steel works, plumbing rehabilitation including valves, faucets, basins, WCs, installation of water tanks, deep cleaning, and restoring all classrooms and service areas to full functionality. Work spans seven schools across Gaza: Al-Moatasem, Basheer Al-Rayes, Mostafa Hafez, Hasan Salamah, Khawlah, Deir Al-Balah Elementary, and Al-Nusseirat.
Value: 1,940,000 ILS (Grand Total)
Status: Ongoing
Executed Projects
1. Emergency Water Well Drilling – Deir Al-Balah & Khan Younis
Scope of Work:
The project involved drilling and equipping emergency water wells to support immediate water supply needs in Deir Al-Balah and Khan Younis. Works included well excavation, casing installation, pump fitting, and full commissioning to restore essential water access for affected communities.
Year: 2025 — Value: $61,700 USD
2. Winterization & WASH Improvements for Six Governmental Schools – Khan Younis & Middle Area
Scope of Work:
The project included implementing winterization measures and upgrading WASH facilities in six governmental schools. Works involved improving sanitation blocks, repairing water networks, enhancing drainage, and ensuring safe, weather-resistant learning environments.
Year: 2025 — Value: ₪197,870
3. Improving Security & Operational Conditions at UNICEF Premises
Scope of Work:
This project focused on enhancing the physical security infrastructure and improving operational systems at UNICEF facilities. Works included structural upgrades, access-control improvements, lighting enhancements, and safety installations.
Year: 2024–2025 — Value: ₪211,800
4. Upgrading of Nepras Medical Field Point – Khan Younis
Scope of Work:
The project involved rehabilitating and upgrading the Nepras medical field point, including structural repairs, facility improvements, and enhancements to medical service areas to support emergency and primary healthcare operations.
Year: 2025 — Value: ₪164,000
5. Rehabilitation of Building F – College of Science
Scope of Work:
This project included structural rehabilitation and architectural improvements to Building F at the College of Science. Works involved repairs, facility modernization, and restoration of academic and laboratory spaces.
Year: 2025 — Value: ₪298,000
6. Rehabilitation of Al-Yasmeen Kindergarten – Khan Younis
Scope of Work:
The project covered full rehabilitation of the Al-Yasmeen Kindergarten, including classroom repairs, playground improvements, facility safety upgrades, and restoration of child-friendly learning environments.
Year: 2025 — Value: ₪208,485
7. Supply, Transfer & Installation of Guard Cabin – IMC
Scope of Work:
This project involved supplying, transporting, and installing a fully equipped guard cabin to enhance site security operations for IMC.
Year: 2024 — Value: $19,200 USD
8. Rehabilitation of Al-Rahma Reservoir, Groundwater Wells & Carrier Line – PACK/CARE
Scope of Work:
The works included rehabilitating the Al-Rahma reservoir, upgrading associated groundwater wells, and restoring the main carrier line. Activities covered structural rehabilitation, pipeline repairs, installation of fittings, and improving overall water conveyance capacity.
Year: 2024–2025 — Value: ₪553,943
9. Rehabilitation of Al-Amal Dumpsite – Khan Younis
Scope of Work:
This project focused on rehabilitating the Al-Amal dumpsite through waste management improvements, land reshaping, environmental protection measures, and preparing the site for safer and more sustainable use.
Year: 2025 — Value: $268,800 USD
10. Repair of Water Wells – Middle Area (CMWU–ICRC)
Scope of Work:
The project included repairing and restoring multiple water wells in the Middle Area, including mechanical rehabilitation, pump replacement, electrical upgrades, and reactivation of essential community water supply points.
Year: 2025 — Value: $53,600 USD